Stud for Thought 3. What is a Live Lab?!
12 October 2026

Practical thinking on road studs, standards and specification
What is a Live Lab?!
I’ve been involved with ADEPT Live Labs 2 for a while now, and we’re finally getting to the bit I’ve been waiting for – the results.
For anyone who hasn’t followed the programme, Live Labs 2 was funded by DfT to look at different ways of decarbonising our local highway network. One of the projects, led by East Riding of Yorkshire Council, focused on street lighting and whether there was a need to light the road with streetlights in the traditional way.
As part of that work, more than 5,000 solar-powered active road studs were installed alongside enhanced markings and signage. It was a big trial. And we now have some interesting findings.
Over a ten-year period, the alternative designs were modelled to deliver a 25% carbon reduction compared with replacing the existing street lighting, potentially increasing to 36% through further value engineering. The modelling also identified £1.24m of financial savings.
The early safety data caught my attention too. Three-quarters of the sites recorded reductions in vehicle speeds, while night-time collisions fell against the wider East Riding trend. It’s still early days on the collision data, and monitoring is continuing for another two years, but it’s encouraging nonetheless.
East Riding as an authority have tried something different and measured what happened. This sort of thought leadership can only help us all and the timing of these findings is particularly useful. The latest DfT Highways Maintenance Transparency Reporting guidance specifically references Live Labs 2. Authorities are being asked to demonstrate what they’re doing around areas such as decarbonisation and innovation and, importantly, provide evidence to back it up.
This is a very important connection.
Live Labs has done a lot of the difficult bit. It has taken ideas, put them onto the highway and started building an evidence base around them. If you’re an authority looking at a similar problem on your own network, that evidence is now there to be considered.
But being able to show that you’ve looked at the Live Labs learning, considered whether it could apply to your network and, where appropriate, done something with it gives you a much more meaningful story to tell around innovation and decarbonisation.
Which got me thinking about what happens next. I don’t particularly want the legacy of Live Labs to be a report that we all read, nod at and then file away somewhere.
I want to see that learning put into practice, helping local authorities tackle real challenges on their own networks.
So we’ve decided to do something about it.
We’ve just launched SolarLite’s Local Authority Impact Challenge 2026, giving local authorities the opportunity to put forward problem areas on their networks where active road studs could make a meaningful difference.
We’re offering three local authorities up to 100 SolarLite active road studs each, including installation, free of charge.
It could be a location where traditional street lighting isn’t the most practical solution, or a stretch of road where improving guidance for drivers during the hours of darkness could make a difference.
What interests me most is understanding the problem, exploring whether there’s a better approach and, importantly, measuring what happens afterwards.
That’s what I think the legacy of Live Labs should be. Taking what we’ve learned and putting it back onto the network.
So if you’re a local authority with an interesting challenge, I’d really like to hear about it.
Find out more about the Local Authority Impact Challenge 2026 and how to apply here: 👉 Find out more and apply through LCRIG:
https://lcrig.org.uk/solarlite-local-authority-impact-challenge-2026/

Next time on Stud for Thought: Staying with performance, I’m going to look at it from the other side – what does the driver actually see on a dark, wet night?
Read More
Read More News
Your Project, Precisely Planned.
Not sure how many studs you need? Our Stud Calculator gives you an instant estimate of quantities and cost, helping you scope your project accurately before you buy.














